DPWH, Manila LGU to begin drainage system expansion along Espana Blvd

DPWH, Manila LGU to begin drainage system expansion along España Blvd
Video: You do not have permission to view the full content of this post. Log in or register now.
The Department of Public Works and Highways (DPWH) will start the expansion of the drainage system along España Boulevard this September.
DPWH Secretary Vince Dizon and Manila City Mayor Isko Moreno inspected a section of España Boulevard in Manila, where severe flooding was reported last week due to heavy rains.
Dizon also mentioned that there will be major construction for the four cross drains in the area.
“Merong mga mangyayaring mga major construction dito in the coming month, starting September. Meron tayong apat na cross drain na gagawin,” Sec. Dizon said
Mayor Isko Moreno mentioned that Manila serves as a catch basin of rainwaters from the mountainous area, that’s why he believes this is the right time to make the expansion.
“Kami talaga ang tagasalo ng tubig coming from the eastern board. So all the way from the mountainside,” he said
Lane closure will be expected once the major construction begins. The LGU and the DPWH asked for understanding and apologized in advance for any traffic disruptions due to construction along España Boulevard.

Source: You do not have permission to view the full content of this post. Log in or register now.
Date posted: July 31, 2026 12:21 PM
 

About this Thread

  • 0
    Replies
  • 9
    Views
  • 1
    Participants
Last reply from:
flex012

Online now

Members online
1,265
Guests online
1,984
Total visitors
3,249

Forum statistics

Threads
2,297,836
Posts
29,118,604
Members
1,203,106
Latest member
Lucryg
Back
Top