SALES PAGE: You do not have permission to view the full content of this post. Log in or register now.
DESCRIPTION:CDE Workflow, BEP, MIDP, TIDP, LOIN, LOD vs LOIN, BIM Roles, Information Requirements, EIR, PIM & AIM, Naming Convention
๐ช๐๐๐ง ๐ฌ๐ข๐จ ๐ช๐๐๐ ๐๐๐๐ฅ๐ก:
โฝ How to set up and manage a Common Data Environment (CDE) workflow from design to handover.
โฝ The real-world difference between basic 3D modeling and true BIM information management.
โฝ Properly define and apply Level of Information Need (LOIN) instead of just relying on LOD.
โฝ Prepare and use key project documents like the BIM Execution Plan (BEP) and Master Information Delivery Plan (MIDP).
โฝ The specific roles and responsibilities of every actor in an ISO BIM project.
โฝ How to transition smoothly from older BIM Level 2 standards to the current ISO 19650 framework.
โ L I N K: โ
You do not have permission to view the full content of this post. Log in or register now.