JUST IN | NEDA Secretary Arsenio Balisacan inamin sa Senado na wala pang aprubado na malaking flood control project ang Marcos Administration sa kabila ng bilyon-bilyung ginagastos ng gobyerno kada taon para sa feasibility study nito.
Like 5500 flood control na nawala parang bula. Or wala talaga.so nagba-budget lang pero walang na-materialize
pang SONA lang yan, he can talk whatever he wants, it is up for the people na magpapa-budolLike 5500 flood control na nawala parang bula. Or wala talaga.
Tama.hehepang SONA lang yan, he can talk whatever he wants, it is up for the people na magpapa-budol